Weather-to-plan for outdoor crews

Know before the crew rolls.

Northwind reads the forecast the way a site foreman would, then gives your crew one line at 05:30: go, go with conditions, or hold. With the numbers that decided it.

Decision · 05:30 run

Tower crane lift, Pier 9

Thu 14 Nov · hourly 06:00 to 15:00

Reading
The call

Hold 11:00 – 14:00

Gusts reach 34 km/h, 4 over the crane limit. Rain at 70% passes the 60% pour limit. Both ease by 14:00, then go.

Synthetic pressure field, redrawn live. Move across it to place a low. Orange isobars: below 1000 hPa

01 · MethodThree steps, no black box

A forecast is a probability. A decision is a rule.

Northwind never asks you to interpret a chart. It reconciles the models, checks them against the limits your crew already works to, and shows its arithmetic.

Step 1 · Read

Reconcile four models into one hourly line

Gusts, rain probability, lightning distance and ground wetness, merged for your exact site and hour.

Gusts, 11:00
32 km/h
Rain chance, 12:00
70%
Nearest lightning
41 km
Rain, last 24 h
14 mm

Step 2 · Apply your rules

Check every hour against your thresholds

Limits are yours, set once per crew type. Anything tripped is named, with its margin.

Gusts ≥ 30 km/hholds lifts
Tripped11:00–13:00
Rain ≥ 60%holds pours
Tripped11:00–13:00
Lightning < 15 kmstops all work
Clear41 km

Step 3 · Decide

One call, sent before the crew leaves

The call, the hours it covers, and the rule behind it. Sent to the site lead and the crane supervisor.

Hold
11:00 – 14:00
Go from
14:00
Sent
05:30 · 3 people
Re-check
every 3 h

02 · Try itSame rules, live

Move the weather. Watch the call change.

Pick a crew, then drag. Every crew type carries its own limits, because a tent, a crane and a drone do not mind the same wind.

Crew type
LimitCaution atHold at Gusts22 km/h30 km/h Rain chance40%60%
24km/h

Gusts in kilometres per hour, 0 to 80.

35%

Chance of rain in percent, 0 to 100.

Call for construction

Care

Go, with conditions

03 · Built forPeople who make the 05:30 call

Built for

  • Tower-crane crews
  • concrete pours
  • location shoots
  • aerial and drone units
  • festival build teams
  • stage and tent riggers
  • roofers and façade crews
  • anyone whose day starts with a sky check

05:30daily call, before the van leaves

1 linefor the crew, the rule behind it for the lead

72 hlook-ahead, hourly, per site

04 · PricingConcept pricing

Priced per site, not per seat.

The whole crew should see the call. These are concept prices for illustration only; nothing here is for sale.

Site

Concept

$49per site, per month

One site, one crew type. For a project that needs a trustworthy morning call.

  • Hourly calls, 72 hours ahead
  • One crew rule set, editable
  • 05:30 and 12:00 briefings
  • Unlimited viewers, no seats

Operations

Concept

$240per month, up to 12 sites

For firms that run several sites and crew types, and need to show why a day was called.

  • Separate rule sets per crew and per site
  • Audit trail: every call, with the data behind it
  • Re-check every 3 hours, 24 hours a day
  • Hand-off to scheduling and dispatch
  • Shared lightning stand-down across sites

Concept pricing. Figures are placeholders chosen to look realistic, not an offer.